Resources
Practical guides for panel builders
Field-tested thinking on running an LV switchgear or panel shop — traceability, BOM readiness, FAT and handover, NCRs and shop-floor visibility.
Operations
Why panel shops outgrow spreadsheets (and what to use instead)
Spreadsheets are where most panel shops start. Here are the signs you've outgrown them, and what a purpose-built system needs to replace.
Read more →Quality
How to improve switchgear build traceability
Traceability is proof, not paperwork. What needs recording on an LV switchgear build, where trails break, and how to make evidence findable.
Read more →Procurement
How to control BOM readiness before a panel build
A panel held up for one missing part is a stage of labour stood still. How to get BOM revisions and material readiness under control before release.
Read more →FAT
Common causes of FAT and handover delays — and how to remove them
A panel can be built and tested and still ship late because the pack isn't ready. The usual causes of FAT and handover delays, and how to fix them.
Read more →Quality
How NCRs should be tracked in panel manufacturing
A non-conformance you can't find is one you can't learn from. How to raise, track and close NCRs against the job so the same fault doesn't return.
Read more →