Skip to main content

Electrical panel project management software

Electrical panel project management, from enquiry to handover.

KonstanTrack gives contracts and manufacturing managers one live view of every panel-build project — estimate, design, BOM, build stages, approvals and FAT — with a full audit trail behind each job.

The KonstanTrack dashboard showing active projects, overdue stages, awaiting approval, open NCRs and factory completion

The problem

You can't manage a portfolio of panel builds you can't see.

Panel projects don't fail at one big moment — they slip quietly. A late drawing here, a missing part there, a stage that stalled while everyone assumed it was moving. By the time it shows up in a delivery date, the cheap moment to fix it has passed.

Managing this from spreadsheets and status meetings means you're always looking at last week. What contracts managers need is the current picture: what's at risk now, what's awaiting approval, and where each job really is against its programme.

How KonstanTrack helps

How KonstanTrack helps managers

One live portfolio view

Active projects, build-stage progress, material readiness, approvals and handover status — all update the moment something changes on the floor.

Risk surfaced early

Stalled jobs, missing parts and at-risk delivery dates appear while there's still time to react.

Approvals with accountability

Supervisor sign-offs are captured against the job, so you know what was approved, by whom and when.

A full audit trail per job

Enquiry to handover, every key action recorded — the answer to a queried build, and the evidence for a clean handover.

What you get

Built for the job, not bolted on.

01

Estimate-to-actual visibility

Quote and cost data stays tied to the job, so you see where time and cost went.

02

Programme tracking

Real build stages and percent-complete, not a guess in a meeting.

03

Material readiness

Know which jobs are ready to build and which are waiting on parts.

04

NCR management

Quality issues raised, tracked and closed against the project.

05

FAT & handover

Test sign-off and the handover pack ready on the promised date.

06

Reporting

Portfolio status you can share, drawn from live data, not re-keyed.

FAQ

Questions, answered.

Is this a generic project tool?

No. KonstanTrack is built around the LV panel workflow — estimation, GA/schematic and BOM revisions, build stages, approvals, FAT and handover — rather than a generic project tool adapted to fit.

Who in the business uses it?

Estimation teams keep quotes and revisions in one place; panel and wiring teams get a clear work queue; manufacturing and contracts managers get one portfolio view with a full audit trail.

How accurate is the build-stage progress?

Progress reflects real build stages updated on the floor, so percent-complete is something you can trust rather than a status-meeting estimate.

Can we report to our own customers from it?

You get a live view of project status and a complete audit trail per job, which makes status updates and handover evidence straightforward to produce.

Does it do electrical panel production tracking?

Yes. As well as project management, KonstanTrack does electrical panel production tracking — real build-stage progress from the floor, percent-complete you can trust, and material readiness across every live job.

How is it priced?

Pricing is quote-based, depending on team size and how you work. Request a quote and we'll review your workflow first.

Let's review your workflow.

Tell us how your shop tracks work today — paper, whiteboards, spreadsheets or existing systems. We'll come back with a proposal shaped around your team, project volume and build process. Pricing is shaped around your operation, not rigid tiers.

Electrical Panel Project Management Software · KonstanTrack