Skip to main content

NCR & quality tracking

NCR tracking that keeps quality issues on the job, not on a spreadsheet.

KonstanTrack lets panel manufacturers raise, track and close non-conformances against the job — with a full audit trail — so problems are caught while they're cheap and resolved with a record.

Recording a non-conformance against a panel-build job, with who, what and when

The problem

A non-conformance you can't find is one you can't learn from.

Quality issues happen on every floor. The problem isn't the NCR itself — it's when it lives on a loose form or in someone's head, with no link to the job, no owner and no record of how it was closed. The same fault comes back because nothing was learned the first time.

Caught early and recorded properly, an NCR is cheap and useful. To get there, it needs to be raised against the job, owned, tracked to closure and held in the same audit trail as the rest of the build.

How KonstanTrack helps

How KonstanTrack handles non-conformances

Raised against the job

NCRs are logged against the panel and stage they relate to, not on a separate sheet, so context is never lost.

Tracked to closure

Open quality issues are visible across the floor, with a clear view of what's still in progress and what's resolved.

Caught while they're cheap

Problems surface early in the live view, when there's still time to react before the panel is held up.

Held in the audit trail

How an NCR was raised and resolved sits in the job's full history — useful for handover, and for not repeating it.

What you get

Built for the job, not bolted on.

01

Raise NCRs in-system

Log a non-conformance against the job and stage.

02

Ownership & status

Each NCR has an owner and a clear open/closed status.

03

Floor-wide visibility

Open NCRs surfaced in the live dashboard.

04

Resolution record

How it was closed, captured against the job.

05

Audit trail

NCR history part of the job's full record.

06

Export & ownership

Your quality records, exportable — no lock-in.

FAQ

Questions, answered.

How are NCRs linked to the build?

Non-conformances are raised against the specific job and build stage, so they carry context and sit in the same audit trail as the rest of the build.

Can managers see open quality issues across the floor?

Yes. Open NCRs are surfaced in the live dashboard alongside at-risk jobs and approvals, so quality issues are visible rather than buried.

Does it record how an NCR was resolved?

Yes. The resolution is captured against the job, giving a record of what happened and how it was closed — useful at handover and for preventing repeats.

Is this a full QMS?

KonstanTrack handles NCR and quality records as part of the build workflow, with a full audit trail. It focuses on quality in the context of the job rather than being a standalone, certified QMS.

How is it priced?

Pricing is quote-based. Request a quote and we'll review how you handle NCRs and quality records today first.

Let's review your workflow.

Tell us how your shop tracks work today — paper, whiteboards, spreadsheets or existing systems. We'll come back with a proposal shaped around your team, project volume and build process. Pricing is shaped around your operation, not rigid tiers.

NCR Tracking Software for Panel Manufacturing · KonstanTrack