FAT & handover software
FAT and handover, ready on the date you promised.
KonstanTrack captures factory acceptance test sign-off and assembles the O&M / handover pack against the job — so nothing ships unverified and the documentation is ready when the panel is.

The problem
The build is finished. The handover pack is still being chased.
A panel can be fully built and tested and still ship late, because the paperwork isn't ready. Test certificates, inspection records, drawings and the O&M documentation get pulled together at the last minute, from wherever they happen to live — and the handover date slips on admin, not engineering.
FAT and handover should be the natural end of the build, not a separate scramble. When test sign-off and documentation are captured against the job throughout, the handover pack assembles itself.
How KonstanTrack helps
How KonstanTrack makes handover clean
Test sign-off captured against the job
FAT and final test results are recorded in the system, so nothing ships unverified and the evidence is already in place.
The handover pack assembles itself
Inspection records, test sign-off and O&M documentation come together against the job rather than being chased at the end.
Ready on the promised date
Because the pack builds as the job progresses, handover lands on the date you committed to — not days later.
A complete, auditable record
Every key action is in the audit trail, so the handover is backed by a full history of the build.
What you get
Built for the job, not bolted on.
01
FAT sign-off
Factory acceptance test results recorded against the job.
02
O&M / handover pack
Documentation assembled and ready for issue.
03
Inspection records
In-process and final inspection captured throughout.
04
Nothing ships unverified
Test status visible before a panel leaves the floor.
05
Audit trail
Full history behind the handover evidence.
06
Export & ownership
Your handover records, exportable — no lock-in.
FAQ
Questions, answered.
What goes into the handover pack?
Inspection records, FAT/test sign-off and O&M documentation are assembled against the job, so the pack reflects the actual build and is ready to issue at handover.
Does this cover FAT and handover for LV switchgear?
Yes. FAT and handover for LV switchgear, distribution boards and control panels work the same way — test sign-off and the O&M/handover pack are captured against the job, to BS EN IEC 61439.
Does it run the test, or record it?
KonstanTrack captures and organises test sign-off and the evidence around it. It does not replace your test equipment or your responsibility for the testing itself.
How does it help us hit handover dates?
Because documentation is captured against the job as the build progresses, the handover pack is largely ready when the panel is, rather than being assembled from scratch at the end.
Can we prove a panel was verified before it shipped?
Yes. Test sign-off is recorded against the job and sits in the audit trail, so there's a clear record that a panel was verified before handover.
How is it priced?
Pricing is quote-based. Request a quote and we'll review your FAT and handover process first.
Let's review your workflow.
Tell us how your shop tracks work today — paper, whiteboards, spreadsheets or existing systems. We'll come back with a proposal shaped around your team, project volume and build process. Pricing is shaped around your operation, not rigid tiers.
